Upper Transverse Link
1 - Wheel Bearing Housing
2 - Bolt
70 Nm + 180º
Replace after removing
3 - Front Upper Transverse Link
Removing and installing. Refer to
â†
Front Upper Transverse Link, Removing and Installing
Special tools and workshop equipment required
Torque Wrench 1332 40-200Nm -VAG1332-
Caution
This procedure contains mandatory replaceab
Rear Lower Transverse Link, Removing and Installing
Special tools and workshop equipment required
Torque Wrench 1332 40-200Nm -VAG1332-
Engine and Gearbox Jack -VAS6931-
Engine/Gearbox Jack Adapte
The following systems are offered:
8RM - Basic sound system.
9VD - Standard sound system.
9VS - Premium sound system, Bang & Olufsen.
8RM - Basic Sound System
One speaker in the left and right front doors
One speaker on the left and right side of the instrument
panel
Two
Special tools and workshop equipment required
Engine Support Bridge -10-222A-
Procedure
- Remove the engine cover. Refer to
→ Servicing - 4-Cylinder 2.0L 4V TFSI Engine; Rep. Gr.10; Engine
Cover; Engine Cover, Removing and Installing.
- Position the -10-222A- as shown